Roads, Laneways, Car Parks and Pathways | Renewal Programs
- Project scheduleSeptember 2025 to May 2026
Last Updated: 28 August 2026
Stay Informed About Local Roads
We’re committed to keeping our community informed about upcoming and ongoing road projects across the Town of Cambridge. Here’s how you can stay up to date:
Advance Notifications: Local Residents receive mailed notices ahead of scheduled works in their area.
Interactive Road Works Map: Explore current and planned projects using our interactive map.
Online Notifications: View digital copies of resident notifications under the ‘Related Information’ section at the top right of this page.
Variable Message Boards: For roads with high traffic volumes, electronic signage may be installed to provide advance notice of works.
For further details, please refer to the contact details located at the top right of this page.
Road Reconstruction Program
The Boulevard (Clanmel Road to Bold Park Drive)
- 13 to 15, 18 to 21, 23, 26, 27 & 29 October 2026. 12, 15 & 16 November 2026
Cambridge Street (Southport Street to Oxford Close eastbound)
Cambridge Street (Marlow Street to Selby Street westbound, including kerb replacement in Veryard Terrace)
- 26 to 30 November & 1 December 2026
Selby Street (Grantham Street to Ruislip Street)
Railway Parade (Haydn Bunton Dr to Blencowe Street)
Asphalt Resurfacing Program
Northwood Street (Cambridge Street to Railway Parade)
Nightworks
We wish to inform residents that work at the above location will be taking place at night. These works are necessary to ensure long-term improvements to local infrastructure; however, they may result in increased noise levels during nighttime hours. We understand this may cause disruption to sleep and impact general living standards, and we sincerely appreciate your patience and understanding during this time. Where possible, we are taking steps to minimise disturbances, and we’ll keep you updated with any changes to the schedule.
What to Expect During Work
Local residents will receive notification about the upcoming works 1–2 weeks before they begin. The letter will provide an overview of the works, including key dates and times, and outline any specific impacts. Due to the nature of the work, sections of the road may be left unsealed and open to traffic at various times, which may lead to increased dust and noise in the immediate area. While this is unavoidable, measures will be implemented to minimise the impact. Speed reductions and detours will be in effect for the duration of the works.
Road Closures and Detours
Notifications about road closures, including specific times, will be posted on this page once the schedule is confirmed. General asphalt resurfacing works are expected to be completed within two to three days. All affected residents will receive direct notifications at least two weeks prior to the start of the work.
Road Rehabilitation Program
Maintaining the integrity of our roads is essential for safety, comfort, and long-term value. Through our Road Rehabilitation Program, we ensure that the Town’s 200 km network of sealed roads and laneways continues to meet the needs of our community.
Why Road Rehabilitation Matters
Well-maintained roads:
- Reduce wear on vehicles
- Minimise traffic disruptions
- Enhance safety for all users
- Lower long-term maintenance costs
This program is part of our broader commitment to infrastructure quality. If you're nearby, you may experience temporary disruptions, but also smoother roads ahead.
Funding is provided by the Town, Federal and State Governments under the State funding program.
Assessment Process
Each project begins with a thorough pavement investigation, including:
- Surface distress analysis: cracking, rutting, patching, and depressions
- Traffic load assessment
- Review of resurfacing/rehabilitation history
This ensures we select the most appropriate treatment for each road section.
Rehabilitation Methods
1. Resurfacing
Used when the underlying structure is sound and expected to last another 20+ years.
Process:
- Remove top asphalt layer
- Apply a new asphalt surface Analogy: Like replacing the carpet on a sturdy floor
2. Road Reconstruction/Pavement Rehabilitation
Needed when deeper structural issues are found.
Process:
- In-situ stabilization to rebuild the pavement’s foundation
- Designed to extend service life and prevent early failure
Maintenance Guidelines
We target roads based on age and condition. Here's the general resurfacing schedule:
| Road Category |
Interval |
| Lanes & Paths |
30-35 Years |
| Access Roads |
30 Years |
| Local Distributor Roads |
25 Years |
| District Distributor B |
20 Years |
| District Distributor A |
15 Years |
These are adjusted based on real-time inspections of each road section
Annual Goals